Seaward PrimeTest 50 Instructions d'exploitation Page 20

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 48
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 19
PrimeTest 250
+
Operating Instructions
18
Power ON/OFF = press and hold CLI and CLII
simultaneously
Class I appliance test = press the CLI key
Class II appliance test = press the CLII key
Cord / extension lead test = press the CLI key
Enter Setup Mode = press the SETUP key
Once in the setup mode the CLII button can be
used to the change the Insulation voltage while
the LKGE button can be used to change the ILEAK
pass/fail limit. To leave the setup mode press the
SETUP button.
30mA RCD test = press the 30mA RCD key
3 phase appliance test = press the 3 phase key
Note: The PrimeTest 250
+
will automatically
switch OFF after approximately 1 minute if no
keys are pressed.
Note: When a key is pressed to initiate a test
sequence, the PrimeTest 250
+
will compare
the type of appliance connected with the test
sequence that has been selected, and where
possible, will prompt the user if an inappropriate
test has been selected.
For example, if an IEC lead is connected between
the front panel mains socket and the IEC socket
on the end panel and a CLI appliance test is
selected, the PrimeTest 250
+
will fl ash the Cord
test enunciator to indicate that the Cord test is
the most appropriate test.
Vue de la page 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 47 48

Commentaires sur ces manuels

Pas de commentaire